How long does a house extension take?

A house extension has two stages: getting the design and approvals in place, then the build itself. Here is how long each stage usually takes in London, what happens on site stage by stage, and what can make it take longer.

By Buildspace Projects · November 2026

The short answer

Most single-storey extensions take 12–20 weeks on site, depending on the type. The design and approvals stage comes before that.

Before the build

On site, in order

  1. Setting up the site and demolition.
  2. Foundations and drainage.
  3. Walls, steelwork and roof.
  4. Windows, bifold or sliding doors and roof lights.
  5. First fix: electrics and plumbing.
  6. Plastering.
  7. Second fix, kitchen and flooring.
  8. Snagging and handover.

What can make it take longer

How we keep it on track

One team handles the drawings, planning and build, with a single project lead from start to finish. We agree the programme with you before work starts.

Questions homeowners ask

How long does a single-storey rear extension take to build?

Most single-storey rear extensions take 12–16 weeks on site. Side-return extensions take 12–18 weeks and wraparound or L-shaped extensions 14–20 weeks, depending on size and specification.

How long does planning permission take for an extension?

Councils aim to decide householder planning applications within 8 weeks of the application being validated. Many single-storey rear extensions are permitted development instead, which can be confirmed with a lawful development certificate.

Do I need a party wall agreement before my extension starts?

If the work involves a shared wall, a new wall on the boundary or digging foundations close to a neighbour's, you need to serve party wall notices before work starts: 1 month's notice for a new wall on the boundary and 2 months' for work to an existing party wall. We arrange this through our partner party wall surveyors.

Plan your extension

Get an instant budget range, build time and planning route, or start with the design and planning.

Get a free build estimate → Design and planning (Plan It) →